Jamb Unveils New Guidelines For 2017 Utme

THE JOINT ADMISSIONS AND MATRICULATION
BOARD ( JAMB) HAS UNVEILED NEW GUIDELINES
THAT WOULD HELP TO CURB THE FRAUDULENT
PRACTICES IN THE EXAMINATION SYSTEM AHEAD
OF 2017 UNIFIED TERTIARY MATRICULATION
EXAMINATION ( UTME) .

THE GUIDELINES SHOULD ALSO BE FIRMLY HELD
BY BOTH THE EXISTING AND INTENDING CBT
CENTRE OWNERS .

1) MINIMUM 15 INCHES FLAT SCREEN
COMPUTER MONITOR FOR DESKTOP OR 17
INCHES FOR LAPTOP.

2) THE COMPUTER SYSTEMS MUST BE
CONNECTED TO A ROBUST COMPUTER
SERVER WITH A CAPACITY TO CARRY 250
SYSTEMS CONCURRENTLY.

3) ALL THE COMPUTER SYSTEMS MUST BE
LINKED TOGETHER ON CABLE LOCAL AREA
NETWORK TOPOLOGY ( LAN ) . ( WIRELESS
COMPUTER CONNECTION IS NOT
ALLOWED ) .

4) ADEQUATE SECURITY AND MINIMUM OF
FIVE ( 5) TECHNICAL PERSONNEL AND ONE
NETWORK ENGINEER
AVAILABILITY OF BACK -UP POWER SUPPLY
( POWER GENERATING SET OF MINIMUM
40KVA FOR A CENTRE WITH 250 SYSTEMS;
60 KVA FOR 350 SYSTEMS AND 100KVA FOR
ABOVE 350 SYSTEMS) AND UPS / INVERTERS
THAT CAN CARRY ALL SYSTEMS FOR A
MINIMUM OF TWO ( 2) HOURS.

5) — THE CENTRE MUST BE ADEQUATELY
FENCED .
PROVISION MUST BE MADE FOR A
HOLDING ROOM OR RECEPTION FACILITY
E.G CANOPY WITH CHAIRS , ETC .

6) — THE CENTRE MUST NOT BE IN SHARED
PREMISES SUCH AS CINEMA HALL,
SHOPPING MALL , MARKET , ETC .

7) —AVAILABILITY OF ADEQUATE AND
FUNCTIONAL AIR – CONDITIONERS AND
LIGHTING.

cool PROVISION OF UP TO DATE ANTIVIRUS
AND ALL THE SYSTEMS MUST BE VIRUS
FREE.

9) MINIMUM OF WINDOWS 7 OR HIGHER
VERSION OF WINDOWS OPERATING
SYSTEM .

10) IP CAMERA ( CCTV) IS COMPULSORY FOR
ALL CBT CENTERS ( SPECIFICATION TO BE
GIVEN BY JAMB ) .

Leave a Reply

MEET OVER 2000 NOUN STUDENTS HERE. 

Join us for latest NOUN UPDATES and Free TMA answers posted by students on our Telegram. 

OUR ONLINE TUTORIAL CLASS IS NOW ON!!! JOIN US NOW. 
JOIN NOW!
close-link