NSC504 Tma Solutions
1. Which of the following is NOT considered monitoring?
Counting the number of people trained
Tracking the number of brochures disseminated
—>> Attributing changes in health outcomes to an intervention
Collecting monthly data on clients served in a clinicn
2. Components of an M&E plan include all EXCEPT___
The program description and framework
A detailed description of the plan indicatorsn
None of the above
—>> All of the above
3. Level of monitoring are all except____
Managers at the operational level
—>> Managers at the planning level
Managers at the middle level
Managers at the top level
4. M&E plans should include:
The data collection plan
A detailed description of the indicators to be used
A plan for the utilization of the information gained
—>> All of the above
5. The results of M&E activities can be disseminated through:
Written reports
Press releases
None of the above
—>> All of the above
6. When should the M&E plan be created?
—>> During the design phase of a program
At the midpoint of the program
At the end of the program
After all of the data have been collected but before they are analyzed
7. Evaluations measure:
How closely a program kept to its budget
How well the program was implemented
—>> The outcomes and impact of a program’s activities
The timeliness of a program’s activities
8. At what stage of a program should monitoring take place?
At the end of the program
—>> Throughout the life of the program
At the mid-point of the program
At the beginning of the program
9. The purpose of indicators is to:
Provide program accountability
Describe the objectives of a project
Demonstrate the strength of the information system
—>> Serve as benchmarks for demonstrating achievements
10. Monitoring is sometimes referred to as:
—>> Process Evaluation
Performance Evaluation
Impact Evaluation
Evaluation